william Ma, Web Designer In Training

William Ma, Pastor, Web Designer and Smart P&ID Consultant

Summary of Qulifications

Senior mechanical engineer , Software Application consultant, with diversified, solid 25 years of experience in high-pressure, time sensitive businesses. Quickly learns new technology and creates practical, easy methods to apply knowledge on the job. Optimal delivery of products/services, innovator in logistics and scheduling for complex operations. Known for proficiency in trouble shooting, building team and external relationships, mentoring, organization and planning.

SELECTED HIGHLIGHTS

PROFESSIONAL EXPERIENCE

Alberni Christian Village Jan.2023-Present

Pastor

Conduct Sermon, Bible Study, Devotion. Website maintenance using WP, Html, CSS, JS. Basic architecture design using Smart Sketch and site construction using various equipment and tools

ReVisionz Canada May.2021-Dec.2022

Smart P&ID Administrator/Checker

Work for client NOVA Chemical and NWR, Using Smart P&ID software data maintenance, trouble-shooting, new site build up, plant transfer from client. as-built drawing checking.

RedLine Technical Inc (at CNRL office) Apr.2019-Dec.2019

SPPID Specialist

Working at Asbuilt Team. Asbuilt P&ID drafting , using Smart P&ID, SPR, McLaren document Manager, Maximo etc.

Calgary Chinese Pentecostal church. Sept.2016-Apr.2019

Mandarian Congregation Pastor

preparing weekly sermons, preaching and conducting worship services. care and counseling to church members and assist them in crisis situations. Creating and maintaining small groups. Creating and organizing Annual Mandarin, Cantonese and English three congregations Ping Pong tournament. Maintening Chinese New Year celebration and other events.

INTERGRAPH CANADA. Jun.2012-Aug.2015

Smart P&ID Application Consultant

Working on SPPID software trouble shooting, Service Request from Clients.

Smart P&ID Specialist

Intergraph employee, sub-contract with North West Red water (Phase1) Duties: Smart Plant P&ID Auditing, tools using procedure writing, service request, etc.

Intergraph employee, sub-contract with Canadian Nature Resource (Horizon project) Duties: Smart Plant P&ID as-building, drawing check, trouble shooting, provide user training.

AMEC AMERICAS LTD. (CALGARY, AB.) Mar.2010-Jun.2012

Senior Smart P&ID designer

WCMP project (West Canada Major Projects, Imperial Oil) Smart P&ID drafting, generate LDT, Valve List report (including create template).

AMEC AMERICAS LTD. (OAKVILLE, ON.) Jun.2009-Mar.2010

Smart P&ID Specialist

Kearl Project (Imperial Oil) Utility P&ID Drafting, generate LDT, Valve List report(including create template), trouble shooting, solution, training new designers.

WORLEYPARSONS CALGARY, AB.) Nov.2007-Oct.2008

Senior Smart P&ID designer

Albian Sands Project, Shell Froth & Extraction PFD, P&ID drawing drafting. training new drafters. Software: SmartPlant, Microstation

AMEC AMERICAS LTD. (CALGARY, AB.) Mar.2005-Nov.2007

Smart P&ID Designer

Kearl Project, Imperil Oil Project, Froth & Extraction PFD, P&ID drawing drafting. Training new drafters. Software: SmartPlant, AutoCAD

P&ID/Microstation drafter

P&ID -built drawing drafting. Total finished -built drawing: 200 pieces, -built line lists: 200 pieces.

Document control clerk

Researched technical documents such as Regular Drawings, Data Sheets, Calculations, Data Books.

BRIDGESTONE TIRE INC.(China) May.2000-Jul.2004

Mechanical Engineer

Designed and modified the Conveyor of Mixer production train. Redesigning the speed control of mix roller and conveyor by using sensors and inverters, this improved production efficiency by 24%. • Designed dust collector. Principle: blow the carbon dust through a filter using a blower, collect the carbon and send it back to a tank. The new system increased the dust cleaning capability by 30%. • Designed mould moving equipment. Principle: push the heavy mould to the right place using an air cylinder. Target: alter from manpower to air control, thereby improving the safety and efficiency by reducing the personnel required. • Prepared monthly and yearly maintenance plan for the production line (conveyor); successfully completed over 60 trouble- shooting tasks.

BRIDGESTONE TIRE INC. (Fukuoka, Japan) Jun.2001-Jun.2002

Mechanical Engineer

Mechanical Engineering On-Job Training in Fukuoka Tosu Factory, Japan. Redesigned the Conveyor Automatic Centering System to replace the manual centering with automatic centering system. Improved accuracy 25%, and saved operation time by 30%. • Conducted routine maintenance and troubleshooting on new and old equipment in a timely and efficient manner.

TIANJIN GAS COMPRESSOR LTD.

Mechanical Engineer

Design manufacturing parts, manufacturing technology process and clamps.

EDUCATION

Bachelor degree of Science

Tian Jin University of Technology

Other Training and Courses: